Scope of Works
Zack Contractors Ltd were contracted by Volker Laser to undertake the public realm highway works for the regeneration of York Street Archway in Bath town centre.
Works included the removal of all existing asphalt surfacing and kerbs in readiness for waterproofing the existing soffit slab to the underneath Victorian basement vaults.
Works involved the installation of new surface water drainage channels and Scoutmoor Yorkstone natural stone paving / kerbs to create a pedestrianised area to suit the new design layout, liaising closely with the client and key stakeholders including Bath and North East Somerset (BaNES) to ensure the heritage aesthetic of the area is maintained.
Works undertaken included:
- Installation of Surface Water Drainage Channels
- Reconstruction of all Footways / Carriageways Using Natural Stone Paving / Kerbs
- Installation of Street Furniture
Zack Contractors Ltd had early involvement with the client and key stakeholders to identify risk, assist with material specification / procurement.